Riverwalk
DOB construction filings, active permits, 311 service complaints, and PSD incident blotters for 425 Main St — Riverwalk Landing.
29
$322,251 estimated work60
931h average resolution time121
incidents logged87
31 Safety / 53 ECB / 3 HPDProperty Specifications & Tax Parcel
NYC Dept. of City Planning PLUTO- Year Built
- 2006
- Stories / Floors
- 16
- Residential Units
- 216
- Gross Floor Area
- 195,990 sq ft
- Building Class
- RM
- Tax Parcel (BBL)
- Lot 7502
Mixed Residential & Commercial Condominium
BBL 1013737502
Public Safety Blotter Logs (121)
View All PSD LogsInvestigations (Non-Criminal) Reported at 425 Main Street. Crim - PSD responded.
Responding Unit: Crim
Aided (Medical Emergency) Reported at 425 Main Street. EMS, PSD Responded - Refused Medical Attention.
Responding Unit: EMS, PSD Responded
Petit Larceny Reported at 425 Main Street. PSD Responded - Gone on Arrival.
Responding Unit: PSD Responded
Aided (Medical Emergency) Reported at 425 Main Street. EMS, PSD Responded - Transported to hospital.
Responding Unit: EMS, PSD Responded
Harassment Reported at F ront of 425 Main Street. PSD responded - Report filed.
Responding Unit: PSD responded
Investigations (Non-Criminal) Reported at Front of 425 Main Street. Crim\ - PS D responded.
Responding Unit: Crim\
Public Safety Escort Reported at 425 Main Street. PSD responded - Completed.
Responding Unit: PSD responded
Gas Leak Condition Reported at 425 Main Street. PSD responded - Co ndition Unfounded.
Responding Unit: PSD responded
Aided (Medical Emergency) Reported at Front of 425 Main Street. PSD responded - Refused Medical Attention.
Responding Unit: PSD responded
Petit Larceny Reported at 425 Main Street. PSD Responded - Gone on Arrival.
Responding Unit: PSD Responded
Department of Buildings Permits (29)
View All PermitsPROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Installation of suspended scaffold for facade work or inspection.
Miscellaneous replacement/repair of brick masonry, miscellaneous repair of concrete slab edges with repair mortar, and miscellaneous waterproofing. No change in use, egress, or occupancy.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
SEVEN NON ILLUMINATED NON ADVERTISING ACCESSORY AWNINGS - LEGAL USE AS PER CERTIFICATE OF OCCUPANCY #104331153F - DUANE READE BY WALGREENS - NO CHANGE TO USE, EGRESS, OR OCCUPANCY
THREE NON ILLUMINATED NON ADVERTISING ACCESSORY AWNINGS - LEGAS USE AS PER CERTIFICATE OF OCCUPANCY #104331153F - DUANE READE BY WALGREENS - NO CHANGE TO USE, EGRESS, OR OCCUPANCY
Building Modification / Repair
INSTALLATION OF SIDEWALK SHED
311 Quality-of-Life Log (60)
View All 311 Logs3 or More
Elevator - Multiple Devices On Property
"The Department of Buildings investigated this complaint and determined that no further action was necessary."
Loud Music/Party
"The New York City Police Department responded to the complaint and their investigation determined that no criminal violation existed. The condition was corrected without the need to issue a summons or effect an arrest. If the problem persists, please contact 311 to create another complaint. If possible, provide contact information so responding officers may reach out to you for more details. If necessary, your complaint may be referred to your local precinct's special operations units (Quality of Life, etc.). Thank you for your attention to this matter. We count on New Yorkers like yourself to maintain a safe City, so please let us know if you see other conditions that require our attention."
Sidewalk
"The Department of Sanitation investigated and found this complaint to be out of jurisdiction. The Department of Sanitation reviewed this and found it not to be meeting the criteria for a complaint or service request."
Roadway
"The Department of Sanitation investigated this complaint and found no condition at the location."
Chemical Vapors/Gases/Odors
"The owner or manager of the property was sent an advisory to correct the condition. If the condition persists, please call 311 or go online to www.nyc.gov/311 and submit another complaint."
STEAM PIPE/RISER
"HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed."
RADIATOR
"HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed."
Squirrel
"The Department of Sanitation investigated this complaint and found no condition at the location."
Boiler - Defective/Inoperative/No Permit
"The Department of Buildings investigated this complaint and determined that no further action was necessary."
HPD Housing Code Violations (3)
View All HPD Violations§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT 1STRY PUBLIC HALL AND OUTSIDE BOILER ROOM
DOB Safety & Equipment Violations (31)
View All Safety ViolationsViolation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Cycle 1, Sub-cycle C (premises is in Community District 8)
Cycle 1, Sub-cycle C (premises is in Community District 8)
Cycle 1, Sub-cycle C (premises is in Community District 8)
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
DOB OATH & ECB Citations (53)
View All DOB Citations3314.10.11 OBS SUSPENDED SCAFFOLD INSTALLED@ EXPO 1&2& LEFT PARKED IN AN ELEVATED POSITION. SCAFFOLD NOT LOWERED TO THE GROUND, ROOF, OR DESIGNATED LANDING AREA WHEN NOT IN USE.CD5 DOESN'T IDENTIFY A DESIGNATED
NO RECORDS OR DOB NOTIFICATIONS ON FILE FOR REMOVAL OF SUSPENDED SCAFFOLD.UPON FURTHER REVIEW OF DOB NOW/BIS,NO PERMITS,FILINGS,OR DOCUMENTATION WERE FOUND VERIFYING AUTHORIZED REMOVAL. LIMITED COMPLETION DATED
AT THE TIME OF MY INSPECTION OBSERVED SUPPORTED SCAFFOLD INSTALLED AT 3XP#1 FROM GROUND TO SETBACK AND ON SETBACK -UPON CHECKING SITE SAFETYPLAN NO SUPPORTED SCAFFOLDS INDICATED ON PLANS-STOP ALL USE OF SUPPORT
AT THE TIME OF MY INSPECTION OBSERVED SUSPENDED SCAFFOLDS AT EXP#1 AND 4-WITH LINES IN MOTORS(PREVIOUS WORK ON FACADE OBSERVED)-UPON ASKING FOREMAN FOR PRE SHIFT INSPECTION FOR SUSPENDED SCAFFOLD,SUPPORTED SCAF
AT THE TIME OF MY INSPECTION OBSERVED SUSPENDED SCAFFOLD LANDED ON EDGE OF CANOPY ABOVE MAIN ENTRANCE -APROX 2/3 FEET FROM END OF CANOPY TO GARDEN BED-NO SIDEWALK SHED PROVIDED-PUBLIC ACCESSIBLE -STOP ALL WORK
OBSERVED SUSPENDED SCAFFOLDS AT EXP#4 INSTALLED CONTRARY TO PLANS-ANCHORAGE ANGLE NOT FLUSH WITH WALL(SPACE,WASHERS BETWEEN ANGLE AND WALL/ANGLE FOR LIFELINE/TIEBACK INSTALLED IN WRONG DIRECTION/PULL OF LIFELI
AT THE TIME OF INSPECTION OBSERVED SUPPORTED SCAFFOLDS INSTALLED AT EXP#1 CONTRARY TO PLANS -INSTALLED ADDITIONAL PLATFORMS FROM STAIR TOWER EXTERIOR TO INTERIOR SETBACKS -AS PER PLAN ONLY STAIRWAY TO BE INSTAL
I RESPOND TO AN INCIDENT THAT OCCURRED ON 10-19-2023 ON THIS JOBSITE WHERE A WORKER INJURED HIS FINGERS AND WAS TAKEN TO HOSPITAL BY AMBULANCE, UPON REVIEW THE DEPARTMENT RECORDS IT WAS REVEAL THAT THERE WAS N
CD5. THROUGHOUT JOBSITE FRAMES FOR SUSPENDED SCAFFOLDS ARE A DIFFERENT TYPE. IN PLACE THERE ARE OUTRIGGER SUPPORTS ON THE TOP & CENTER. CD5 SHOWS FRAMES WITH OUTRIGGER SUPPORTS ON TOP & BOTTOM. DRAWINGS CALL
SITE SAFETY PLAN. I OBSERVED THAT THE PROTECTION FOR THE TREES AT EXPOS # 1 WAS NOT PROVIDED. I OBSERVED THAT A CHAINLINK FENCE WITHOUT DEBRIS NETTING WAS PROVIDED A EXPOS # 4 AS A CAZ. SSP SHOW THAT THE REQU
Ground-Floor Dining & Food Establishments (5)
View Island Dining DirectoryFUJI EAST
455 Main St
Score: 13 penalty points
GRANNY ANNIE'S
425 Main St
Score: 12 penalty points
PICCOLO TRATTORIA
455 Main St
Score: 12 penalty points
PINKS CANTINA RI
455 Main St
Score: 5 penalty points
STARBUCKS
455 Main St
Score: 4 penalty points