FDR Four Freedoms State Park (1 FDR Hope Memorial Way)
Resolved Construction
Class 2 (Major Hazardous)PARTIAL STOP WORK ORDER FOR USING OF WORKING PLATFORM ISSUED PURSUANT TO 28-207.2 & POSTED @ PREMISES. FAILURE TO PROVIDE APPROVED PLAN. NOTE: OBSERVED WORKING PLATFORM HAS BEEN INSTALLED UNDER PERMIT #14053037
Respondent: YORK SCAFFOLD EQUIPMENT C
Issued 2016-08-31
BIN #1085548 • Summons #35199504M
FDR Four Freedoms State Park (1 FDR Hope Memorial Way)
Resolved Construction
Class 1 (Immediately Hazardous)BC3308.1.3 HORIZTONAL SAFETY NETTING NOT PROVIDED 6 STORY BUIDLING UNDER CONSTRUCTION TO THE HEIGHT OF APPRX 98' HAS NO HORIZONTAL NETTING WHEN REACHING 75' WITH PERUR AT ROOF LEVEL.STEEL STRUCTURE TAPPED OUT.
Respondent: TURNER CONSTRUCTION CO
$1,600 Penalty
Issued 2016-05-06
BIN #1085548 • Summons #35183202K
FDR Four Freedoms State Park (1 FDR Hope Memorial Way)
Resolved Construction
Class 1 (Immediately Hazardous)SEC. 3301.1.1 RESPONSIBILITY FOR SAFETY. NOTE: AT THE TIME OF MY INSPECTION OF A 6 STY STEEL FRAME BLDG AT BULKHEAD LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED WORKER GOING BETWEEN CABLES AN LEANING OVER
Respondent: TURNER CONSTRUCTION CO.
$1,600 Penalty
Issued 2016-05-04
BIN #1085548 • Summons #35178516R
FDR Four Freedoms State Park (1 FDR Hope Memorial Way)
Resolved Construction
Class 1 (Immediately Hazardous)SEC. 3308.5 VERTICAL SAFETY NETTING SYSTEMS. NOTE: AT THE TIME OF MY INSPECTION OF A 6 STY BLDG(STEEL FRAME)AT BULKHEAD LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED VERTICAL SAFETY NETTING WAS INADEQUATE FRO
Respondent: TURNER CONSTRUCTION CO.
$1,600 Penalty
Issued 2016-05-04
BIN #1085548 • Summons #35178515P
FDR Four Freedoms State Park (1 FDR Hope Memorial Way)
Resolved Construction
Class 2 (Major Hazardous)JOB SITE FENCE DOES NOT MEET CODE SPECIFICATIONS AT TIME OF INSPECTIONJOBSITE FENCE IS INADEQUATE AS IT HAS MESH MISSING AT NUMEROUS LOCATIONS THE WIRE FENCE ERECTED ON TOP OF THE JERSEY BARRIERS ALSO THERE ARE
Respondent: TISHMAN CONSTRUCTION CORP
Issued 2016-04-30
BIN #1085548 • Summons #35178459J
FDR Four Freedoms State Park (1 FDR Hope Memorial Way)
Resolved Construction
Class 1 (Immediately Hazardous)BC3307.8 FAILURE TO PROVIDE STANDARD GUARDRAIL SYSTEM.AS NOTED AT TIMEOF INSPECTION OF AN ACTIVE CONSTRUCTION SITE OBSERVED WORKERS WORKING AT CELLAR LEVEL AND A FAILURE TO CONSTRUCT A STANDARD GUARDRAIL SYSTEM
Respondent: BARR & BARR INC
$1,600 Penalty
Issued 2015-08-28
BIN #1085548 • Summons #35104058R
FDR Four Freedoms State Park (1 FDR Hope Memorial Way)
Resolved Elevators
Non-Hazardous84, #,# 56, M,07 58,M,07 66,Z,13 33,1,10 84,#,# FAILURE TO REPORTION ACCIDENT PRMPLTY TO DEPT OF BUILDING ACCIDENT OCCURED 8-5-03 REPORTION 8/14/03 58M07 PROVIDE MISSING COVER FOR WIRING ON HOIST MOTOR SECURE
Respondent: HEALTH AND HOSPITALS CORP
$2,500 Penalty
Issued 2003-08-19
BIN #1085548 • Summons #38140933N
FDR Four Freedoms State Park (1 FDR Hope Memorial Way)
Resolved Construction
HazardousFAILURE TO MAINTAIN. DEFECT IS NOTED THE GRANITE APPROX 6", 48" HIGH AND 48" LONG FULL FROM OUT OF THE RETAINING WALL CREATING A HOLE THAT CAUSE ANOTHER GRANITE APPROX 6"X48"X72" TO MOVE OUT OF PLUMB 5" AND TH
Respondent: TO THE HEALTH AND HOSPITA
Issued 1999-10-19
BIN #1085548 • Summons #34228386Y