Construction • CLASS - 1

UNSAFE STORAGE OF MATERIAL DURING CONSTRUCTION OR DEMOLITION.AT THE TIME OF MY INSPECTION OF A PROPOSED 4 STORY NEW BUILDING I OBSERVED MATERIAL BEING STORED ON THE EDGE OF VARIOUS FLOORS IN THE MEZZANINE LEVEL

Location: Cornell Tech (The House) (BIN #1090298, Block 01373)

Resolved
Issue Date

2019-04-18

Penalty Imposed

$2,530

BIN & Block Keys

BIN #1090298 (Block 01373)